[GH-ISSUE #560] I would like 2 borders to work, somehow, possible? #436

Closed
opened 2026-05-05 06:23:03 -06:00 by gitea-mirror · 1 comment
Owner

Originally created by @jaxjexjox on GitHub (Feb 12, 2020).
Original GitHub issue: https://github.com/debauchee/barrier/issues/560

Operating Systems

Windows 10, Windows 7

Barrier Version

2.3.2

Steps to reproduce bug

I have 3 monitors in an odd, T shape configuration

PC1MON1, PC2MON1, PC2MON2
PC1MON2
Pic here:

https://i.imgur.com/QfbhtNy.png

Would be lovely if I could go from TOP of monitor 1b to the BOTTOM of monitor 2a
AS WELL AS
LEFT of monitor 1B to RIGHT of monitor 2B

I want to 'cross' where the red X is

Possible?

Originally created by @jaxjexjox on GitHub (Feb 12, 2020). Original GitHub issue: https://github.com/debauchee/barrier/issues/560 ### Operating Systems ### Windows 10, Windows 7 ### Barrier Version ### 2.3.2 ### Steps to reproduce bug ### I have 3 monitors in an odd, T shape configuration PC1MON1, PC2MON1, PC2MON2 PC1MON2 Pic here: https://i.imgur.com/QfbhtNy.png Would be lovely if I could go from TOP of monitor 1b to the BOTTOM of monitor 2a AS WELL AS LEFT of monitor 1B to RIGHT of monitor 2B I want to 'cross' where the red X is Possible?
Author
Owner

@the-wes commented on GitHub (Feb 28, 2020):

This is not currently possible. This would be a nice feature in the future but is not at the top of the priority list.

<!-- gh-comment-id:592751694 --> @the-wes commented on GitHub (Feb 28, 2020): This is not currently possible. This would be a nice feature in the future but is not at the top of the priority list.
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference: github-starred/barrier#436
No description provided.