[GH-ISSUE #296] Release number inconsistency 2.1.2 vs 2.2.0 #239

Closed
opened 2026-05-05 05:46:09 -06:00 by gitea-mirror · 3 comments
Owner

Originally created by @kgyrtkirk on GitHub (Apr 29, 2019).
Original GitHub issue: https://github.com/debauchee/barrier/issues/296

I think during releasing the 2.1.2 a small typo was made:
On the github releases page; the release 2.2.0 has a tag of 2.1.2

see:
https://github.com/debauchee/barrier/releases

Originally created by @kgyrtkirk on GitHub (Apr 29, 2019). Original GitHub issue: https://github.com/debauchee/barrier/issues/296 I think during releasing the 2.1.2 a small typo was made: On the github releases page; the release 2.2.0 has a tag of 2.1.2 see: https://github.com/debauchee/barrier/releases
Author
Owner

@AdrianKoshka commented on GitHub (Apr 29, 2019):

In my opinion, it's not a huge problem, and I don't see the point of fixing it.

<!-- gh-comment-id:487637965 --> @AdrianKoshka commented on GitHub (Apr 29, 2019): In my opinion, it's not a huge problem, and I don't see the point of fixing it.
Author
Owner

@brianjmurrell commented on GitHub (May 29, 2019):

So what will the next release be then?

It is rather confusing, IMHO.

<!-- gh-comment-id:496775547 --> @brianjmurrell commented on GitHub (May 29, 2019): So what will the next release be then? It is rather confusing, IMHO.
Author
Owner

@AdrianKoshka commented on GitHub (May 29, 2019):

I don't know at the moment, but the tag and version in the application will match.

<!-- gh-comment-id:496922938 --> @AdrianKoshka commented on GitHub (May 29, 2019): I don't know at the moment, but the tag and version in the application will match.
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference: github-starred/barrier#239
No description provided.